In the last four days, we have:
- Swept the downstairs at least 8 times.
- Had our new refrigerator, washer and dryer delivered.
- Painted the master bathroom.
- Painted the master bedroom.
- Bought a new light fixture for the front door.
- Put up all of our kitchen stuff (dishes, pans, pots, etc.)
- Switched out all of the light switches to white ones--they were every possible finish all over the house.
- Painted the built-in storage shelves in the garage.
- Replaced the outdated walkway lights with solar-powered brushed silver ones.
- Cleaned the kitchen and all of the bathrooms.
- Mopped all of the moppable surfaces.
- Had a quote on the cost of the tile install in the kitchen (we're probably going to hold off on this project for now since we have other, more pressing projects).
No comments:
Post a Comment